NGT Variable Blends Project Conclusion
23-04-2026
The GTRC is pleased to have concluded our Blends Variability Study for National Gas Transmission, presenting our findings in a well attended closure meeting. The final report (100+ pages) details the simulated and experimental investigation of the effects of hydrogen additions to the compressor and gas turbine infrastructure of the UK's national gas grid.